Ramp, terminal and maintenance hangar lights were updated to LED. In 2018 new radiant heaters were installed in the aircraft maintenance hangar.In 2016 the old Visual Approach Slope Indicators (VASI) were replaced with new Precision Approach Path Indicators (PAPI) and new Runway End Identifier Lights (REIL).In 2015 additional land was acquired to prepare for future turnaround projects.In 2014 additional hangar access paving was done to accommodate a newly constructed hangar and existing concrete was resealed.In 2013 security fencing was installed around the terminal and parking areas.In 2013 all new runway and taxiway Halogen lighting was installed.In 2012 the Automated Weather Observation System (AWOS) was relocated and all new equipment was installed.In 2011 & 2012 the aviation fuel system was updated to include two 10,000 gallon capacity tanks and a self-serve dispensing system.In 2011 a snow removal equipment (SRE) building was constructed.In 2008 the rotating beacon was upgraded.In 2006 concrete was poured around the hangars and used to widen the existing taxiway.In 2001 security fencing was installed at the north end of the runway.In 1990 the aircraft maintenance hangar was constructed.The runway was resurfaced and a new taxiway and apron were also constructed. in 1986 the hangars were relocated to their present location and a new terminal was constructed.In 1968 the present hard surface runway was constructed and later extended in 1974 to its current length.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |